Building software with an AI delivery pipeline.

From product requirements to release: specifications, tests, independent review and clear decisions at each gate.

Kerry Panchoo · October 2026

What it is

An autonomous software organisation

A directed pipeline coordinates many specialist AI agents through structured, deterministic flow. No single agent controls or directs the pipeline.

  • Each phase uses bounded agents with defined roles, tools, contracts and access.
  • Agents perform only assigned work and enforce the rules within their remit.
  • Explicit gates and routing rules advance, return or stop work based on evidence.
  • Some routing and decision processes use LLM judgement within defined contracts; system rules govern the resulting action.
  • Deterministic gates check entry to each phase and the handoff from reviewer to inquisitor.

Why it works

  • Intent stays visible. Requirements connect to specifications, tests, implementation and acceptance.
  • Proof precedes approval. Tests must detect missing behavior, and results must belong to the current build.
  • Work is challenged independently. Reviewers check quality; inquisitors challenge the findings and evidence.
  • Changes have an owned route. Gaps return to specification, tests or code. New ideas become separate tickets.
  • Completion includes the whole system. Required child work, human acceptance and integration proof precede release.

These controls reduce silent omissions, scope drift and repeated repair. Their value depends on the quality of the requirements, tests and independent examination.

Build profile

Build profile: choose the pipeline

  • Sets the phases, gates, scoring rubric and code-control strictness for the build.
  • Exploratory work may use Requirements → Coding → Testing.
  • Proof of Concept (PoC) may use Requirements → Tests → Coding → IMPL.
  • More rigorous builds require broader phases, stricter gates and deeper proof.

Model profile

Model profile: model routing

Model routing lets us combine models from multiple providers for specific tasks—for example, Codex models for reviewers and inquisitors, and Opus, Sonnet or Sol for coding. Each role has its own model and reasoning effort.

  • Assign a provider, model and reasoning effort to each station or gate.
  • Route generation, review, inquisitor, remediation and decision roles separately.
  • Define tools, fallback and budget; record the actual model and effort used.
  • Model routing changes who performs the work; the build profile still sets its obligations.

Separate responsibilities

Who builds, reviews and decides

Single cobalt angular wing-shaped tool aligning an ivory architectural module over a small folded teal plan.

Builder

Creates the owned artifact within its approved scope.

Single cobalt wing-shaped tool examining an open ivory inspection sheet with three precise teal inset tabs.

Reviewer

Checks the phase rubric and identifies findings for repair and re-review.

Single cobalt wing-shaped tool directing an ivory circular inspection ring toward one teal joint.

Inquisitor

Independently challenges the artifact and the evidence behind approval.

Single cobalt wing-shaped tool beside an ivory boundary frame and a thin teal stopping bar.

Gate controller

Checks policy, scope, freshness, and prerequisites before advancement.

Human participation follows a clear choice: ARA is enabled by default with an opt-out. In every other phase, human-in-the-loop participation is optional and opt-in. These choices do not remove the required engineering gates.

The delivery flow

From requirements to maintenance

Requirements

Requirements analysis, remediation and review

Agree the product. Resolve gaps. Review the requirements.

Define the product

  • Users, outcomes, core scope and acceptance criteria.
  • Mockups, journeys, UI states and responsive behaviour.
  • Build/model profiles, security contracts, deployment and test obligations.

Check the real system

  • Validate files, dependencies, coverage and architecture.
  • Check risks and contradictions against code, tests and history.

Resolve gaps

  • Use evidence, recorded amendments or supported recommendations.
  • Unresolved ambiguity blocks progress; extras become separate tickets.
  • Human input is optional and opt-in.

Generate missing requirements

  • Repair one draft or compare bounded candidates.
  • Combine compatible contributions; preserve provenance.
  • Poor drafts trigger PRD enrichment and regeneration.
An upright cobalt guide organizes three ivory requirements panels along one muted teal connecting ribbon.
Mockups, behaviour, security and proof—defined together.

Review and hand off

  • PASS, RECOMMEND or BLOCK after independent review.
  • Recheck changes; advance only accepted, current requirements.

Phase gates

  • Review Gate: Check clarity, completeness, consistency and acceptance criteria; remediate gaps and re-review.
  • Inquisitor Gate: Independently challenge requirements, assumptions and review evidence. Unresolved blockers prevent handoff.

Next: the build profile sets the route. A Proof of Concept (PoC) may go straight to test writing or development. More rigorous builds proceed to specification.

Specification

Specification: define the behaviour contract

Turn accepted requirements into a testable behaviour contract.

Write the behaviour contract

  • Use accepted requirements, analysis and existing system patterns.
  • Define behaviours, interfaces, constraints, failure cases and numbered acceptance criteria.
  • Link requirements to tests, proof and permitted file changes.

Develop the draft

  • Repair one draft or compare bounded candidates against the same requirements.
  • Combine compatible contributions with provenance; retain success and rejection scenarios.

Generation strategies

Standard · Single generation

  • Generate one draft; review and repair gaps.

Evolutionary selection strategies

  • Sequential Multi-Candidate: generate and assess candidates in sequence.
  • Parallel Multi-Candidate: generate independent candidates concurrently; compare against the same requirements.

Select a coherent draft; retain contribution provenance. Selection still requires review, inquisitor checks and gate approval.

One clean ivory three-level architectural shell with precisely aligned teal divisions and a single cobalt architect fold.
Keep the product intent connected to every obligation.

Review and challenge

  • Reviewer: check clarity, completeness, feasibility and testability.
  • Inquisitor: challenge omissions, contradictions and hidden prerequisites independently.
  • Remediate gaps; repeat affected gates when requirements change.

Gate · Accept the specification

  • Approve a reviewed, traceable contract with complete obligations.
  • Return blocking contradictions to SPEC.
  • Proceed to planning; retain scope and proof.

Phase gates

  • Pre-gate: Check accepted requirements, build profile and contract inputs.
  • Review Gate: Assess the work against the phase rubric; check review completion, blocking findings and current evidence before independent audit.
  • Inquisitor Gate: Challenge completeness, consistency, traceability and testability. Unresolved blockers prevent advancement; repairs repeat affected reviews and gates.

Planning

Turn the contract into owned work

Split the work. Preserve obligations. Schedule dependencies.

Define the tasks

  • Split by behaviour, interfaces, files and resource boundaries.
  • Give each child scope, acceptance criteria, tests, an owner and inherited contracts.

Spec-file sizing and task decomposition

  • Score functional requirements (FRs) by severity and complexity to size each spec.
  • Balance critical, major, medium and minor FRs, their interactions and required proof.
  • Match workload to the coding model’s reasoning, context, tool use and proven performance.
  • Consider UI complexity, security, dependencies, shared files and integration risk.
  • Create independently verifiable child specs; retain criteria, dependencies, ownership and parent links.

Check the family

  • Map every parent obligation to child work.
  • Resolve conflicting criteria, shared files and hidden or circular dependencies.

Development strategy

Third-party library selection

  • Compare library fit, maintenance, licence, security and compatibility.
  • Record versions, trade-offs and dependency obligations.

Third-party tools

  • Choose tools for building, testing and delivery.
  • Define access, data boundaries, costs and reproducible setup.

Implementation strategies

  • Standard sequential — complete tasks in dependency order.
  • Rolling waves — verify each batch; use findings to refine the next.
  • Vertical slices — deliver small, end-to-end user behaviours.
  • Contract-first — agree interfaces, then implement against them.
  • Parallel agents — isolate independent tasks with clear file ownership.
  • Test-driven increments — implement one tested behaviour at a time.
  • Scaffold then fill — build a runnable skeleton, then complete its parts.
  • Incremental replacement — replace existing components one at a time.
Three ivory architectural stations in a row joined by a thin teal ribbon, one upright cobalt guide at the front.

Schedule safely

  • Verify prerequisites before dependent builds.
  • Run independent tasks in isolated worktrees; coordinate shared resources.

Plan review and remediation

  • Review coverage, task boundaries, dependencies, feasibility and verification.
  • Repair plan defects and review again; unresolved findings block handoff.
  • Planning can expose missing requirements or spec decisions. Return gaps to their owning phase; update and re-review affected work.

Planning exit

  • Retain the accepted plan, child specs, coverage map and execution order.
  • Advance only after plan fixes and upstream gaps are resolved.

Phase gates

  • Pre-gate: Check the accepted specification, workload scores and model capabilities.
  • Review Gate: Assess the work against the phase rubric; check review completion, blocking findings and current evidence before independent audit.
  • Inquisitor Gate: Challenge coverage, decomposition, ownership, dependencies and feasibility. Unresolved blockers prevent advancement; repairs repeat affected reviews and gates.

RED · Tests

Tests before implementation

Define the proof, then show missing behaviour fails. Building and validating this coverage makes RED the longest phase of the automated pipeline.

Map each FR to its tests

  • The test matrix derives each FR’s tests from requirements and the build profile.
  • Map applicable behaviours, scenarios and failure modes to assertions, test files and execution commands; record justified exclusions.
  • Depending on testing requirements, an FR can result in 9–15+ tests. This is an indicative range, not a fixed count or quota.

Specify and build tests

  • Create a reviewed Test Spec for each functional requirement.
  • Cover success, rejection, boundaries, fixtures and assertions.
  • Build executable tests after Test-Spec review and independent examination.
  • Test building can expose specification and planning gaps; return them to the owning phase for remediation.

Test generation strategies

  • Standard: generate one test suite; review and repair.
  • Sequential Multi-Candidate: generate a test, assess quality and requirement fit, then remediate or regenerate; update and re-review the Test Spec when needed.
  • Parallel Multi-Candidate: generate independent suites concurrently; compare against the same obligations.

Score and select

  • Solution score: assess coverage, assertion strength, correctness and reliability.
  • Remediation score: estimate the difficulty and work needed to fix the suite; lower is easier.
  • Compare quality with repair effort. Regenerate a poor suite when a fresh solution is easier than debugging it.
  • Selection still requires independent review and fail-first proof.
A teal architectural shell opened to expose one separated ivory fault panel, a small cobalt wing tool waiting outside and one upright guide observing.

Review the proof

  • Apply standard reviewer and independent inquisitor checks to test specs and generated suites.
  • Could incorrect code still pass? Check mocks, assertions and determinism.
  • Re-review remediated specs and plans through their reviewer and inquisitor gates; update affected tests.

Prove RED

  • Capture profile-required fail-first evidence on the identified pre-build revision.
  • Failures must expose missing behaviour, not broken fixtures or syntax.

Gate · Accept tests

  • Require complete coverage across all requirement suites.
  • Route test defects to RED, specification gaps to SPEC and planning gaps to Planning. Unresolved findings block advancement.

Phase gates

  • Pre-gate: Check accepted specifications, the plan and requirement-driven test matrix.
  • Review Gate: Assess the work against the phase rubric; check review completion, blocking findings and current evidence before independent audit.
  • Inquisitor Gate: Challenge test coverage, assertions, reliability and fail-first proof. Unresolved blockers prevent advancement; repairs repeat affected reviews and gates.

GREEN · Build

Build and verify the code

Implement accepted scope. Review it. Prove the current result.

GREEN pre-gate · Admit ready work

  • Deterministically check dependencies, accepted tests and RED evidence, specs, owned files and commands.
  • Missing prerequisites block implementation.

Build within the contract

  • Use minimal-pass, contract-preserving or scoped-remediation strategy.
  • Edit authorised production files; tests remain RED-owned.

Code generation strategies

  • Standard: generate one implementation; assess and repair.
  • Sequential Multi-Candidate: assess quality and contract fit, then remediate or regenerate; re-review spec changes.
  • Parallel Multi-Candidate: generate isolated implementations against the same contract; compare candidates.
  • Use solution and remediation scores to choose repair or regeneration. Selection still requires review, tests and inquisitor gates.

Handle discovered gaps

  • GREEN often exposes feature/specification and test gaps. Record evidence and choose a route.
  • Immediate: fix an item directly affecting the current implementation; repeat affected reviews and tests.
  • Late Discovery: close a gap needed to fulfil the task’s obligations. Child tickets follow the full process and block parent completion.
  • Follow-up: record bugs, deficiencies or necessary features outside the task’s scope as separate tickets for later work.
A teal cylindrical loop connects two ivory modules on a low folded plane, with one cobalt architect fold.

Review and execute

  • The gate checks code quality, interfaces and applicable security/performance.
  • Run every required suite; record revision, commands, environment and results.

Gate · Verify evidence

  • Execution inquisitor checks current runs, active assertions and fixtures.
  • Next: Late Discovery closes required gaps before IMPL reviews the completed work.
  • Route code defects to GREEN, test gaps to RED and contract gaps to SPEC.
  • Refresh affected proof; bound retries and recover from repeated stalls.

Phase gates

  • Pre-gate: Check dependencies, accepted tests and current RED proof before coding.
  • Review Gate: Assess the work against the phase rubric; check review completion, blocking findings and current evidence before independent audit.
  • Inquisitor Gate: Challenge implementation quality, contract alignment and execution evidence. Unresolved blockers prevent advancement; repairs repeat affected reviews and gates.

Late discovery

Find gaps. Complete the corrections.

Required corrections become child tickets through the same full process.

Examine the whole result

  • Compare spec, code and tests for missed paths, mismatches and complexity.
  • Record evidence, affected obligation, owner and source of each gap.

Create owned child work

  • Give each required correction scope, acceptance criteria and file ownership.
  • Inherit parent constraints and build profile; keep new features separate.

Complete the full process

  • Each child follows requirements, SPEC, RED, GREEN, Late Discovery, IMPL, ARA and integration as applicable.
  • Further required gaps create further children until completion.

Gate · Reconnect proof

  • Audit child completion and dependencies; rerun affected parent checks.
  • Block the parent until required children and connected proof are complete.
  • Record an explicit no-gap result when none are found.
A single hourglass-shaped ivory frame containing a teal route, with three small modular stations and one cobalt architect fold.

Phase gates

  • Pre-gate: Check the current implementation, tests and connected requirement evidence.
  • Review Gate: Assess the work against the phase rubric; check review completion, blocking findings and current evidence before independent audit.
  • Inquisitor Gate: Challenge gap findings, required child completion and refreshed parent proof. Unresolved blockers prevent advancement; repairs repeat affected reviews and gates.

IMPL · Implementation review

Review the implementation as a whole

Review alignment

  • Check that every functional and nonfunctional requirement is implemented and meaningfully tested.
  • Review architecture, security, performance and code quality against the accepted contract.

Remediate and verify

  • Return deficiencies for further development or upstream correction; preserve passing tests and rerun affected proof.
  • The inquisitor independently audits requirements, tests, implementation and evidence.
  • Repeat review after remediation. Advance to ARA with resolved findings and current proof.
A cobalt architect fold studies an opened ivory structural shell through one teal inspection ring; one small wing-shaped tool waits outside.

Phase gates

  • Pre-gate: Check completed GREEN work, required discovery corrections and current proof.
  • Review Gate: Assess the work against the phase rubric; check review completion, blocking findings and current evidence before independent audit.
  • Inquisitor Gate: Audit requirement alignment, code, tests and remediation evidence. Unresolved blockers prevent advancement; repairs repeat affected reviews and gates.

ARA

Alignment, Refinement & Acceptance

Focused human participation is on by default, with an explicit opt-out.

Review the outcome

  • Exercise real workflows against PRD outcomes and acceptance criteria.
  • Check usefulness, usability and actual UI behaviour—not screenshots alone.

Gate · Check fidelity

  • Expose omissions, additions and changed assumptions against agreed intent.
  • Keep differences visible; do not rewrite intent to fit the result.

Decide and record

  • Choose acceptance, refinement or a change of direction.
  • Record evidence, tradeoffs, conditions and any explicit opt-out.
  • Other phases offer optional, opt-in human participation.

Refine through the pipeline

  • Approved behaviour changes become a delta specification.
  • Repeat affected SPEC, RED, GREEN and reviews; refresh invalidated proof.
  • Recheck the outcome; keep future opportunities separate and bound retries.
Upright cobalt guide observes three ivory folded panels emerging through one pale teal architectural frame.

Phase gates

  • Pre-gate: Check the accepted implementation review, resolved findings and current proof.
  • Review Gate: Assess the work against the phase rubric; check review completion, blocking findings and current evidence before independent audit.
  • Inquisitor Gate: Challenge outcome fidelity, acceptance evidence and recorded decisions, including any human opt-out. Unresolved blockers prevent advancement; repairs repeat affected reviews and gates.

Integration & release

Integration and release

Verify the combined system on the revision being released.

Gate · Authorise integration

  • Implementation inquisitor audits the complete candidate and connected evidence.
  • Require completed children, acceptance, current proof and visible deferrals.
  • Outstanding blocking work prevents integration.

Combine and recheck

  • Merge approved work into the intended baseline; check shared interfaces.
  • Conflict resolution changes code: refresh affected tests and proof.

Gate · Accept the system

  • Integration inquisitor challenges regression and combined-system evidence.
  • Verify exposed contracts in the required environment; route failures to owned repair.

Release the proven artifact

  • Match source, build and runtime configuration to approved evidence.
  • Authorise deployment, verify target operation and retain lineage and rollback.
  • A merge alone does not prove deployment.
A long ivory bridge joins two teal structural platforms; three restrained connector modules form its deck, one cobalt guide at the near end.

Phase gates

  • Pre-gate: Check accepted work, ARA decisions, dependencies and release inputs.
  • Review Gate: Assess the work against the phase rubric; check review completion, blocking findings and current evidence before independent audit.
  • Inquisitor Gate: Challenge combined-system behaviour, regressions and deployment evidence. Unresolved blockers prevent advancement; repairs repeat affected reviews and gates.

Maintenance

Maintain the released system

Turn operating evidence into scoped, reviewed changes.

Observe and reproduce

  • Use runtime checks, incidents, user reports and dependency changes.
  • Record release identity, environment, symptoms and reproducible evidence.

Route the correction

  • Distinguish code defects, test gaps, changed requirements and environment failures.
  • Create owned tickets with scope and acceptance criteria.

Repeat the discipline

  • Apply the appropriate requirements, SPEC, RED, GREEN, review and integration route.
  • Verify affected behaviour and regressions on the next release.
A large ivory circular mechanism inside an open teal housing, with one small cobalt wing tool and one upright architect fold.

Preserve release control

  • Keep improvements separate from urgent repairs.
  • Carry forward decisions, profile requirements and recovery records.
  • Changed scope or risk requires a recorded decision and refreshed gates.

How advancement works

What happens at a gate

  • Every phase has a deterministic entry gate. A further deterministic gate runs between its reviewer and inquisitor checks.
  • Check the prerequisites first: accepted inputs, owned files, completed dependencies and evidence tied to the current revision.
  • The reviewer assesses the artifact against its phase rubric. Findings identify the location, severity and correction needed.
  • The inquisitor independently challenges both the artifact and the reviewer’s conclusion. A passing review does not automatically mean permission to advance.
  • The gate combines those assessments with deterministic policy checks. Missing proof, stale results or unauthorized changes prevent advancement even when the quality score is high.
  • Blocking findings return to the phase that owns the repair. Repaired artifacts are reviewed again; affected downstream proof is refreshed.
  • ARA provides focused human acceptance by default, with an explicit opt-out. Human involvement elsewhere is optional and opt-in; record decisions and preserve the required proof.

Product Requirements Document · PRD

Start with a defined product

  • Define the problem, users, outcomes, core scope, constraints, and acceptance expectations.
  • Analyze contradictions and missing decisions. Human review of the direction can be opted into.
  • Record useful extras and process improvements as separate work before they become scope creep.

Drift, deferral & recovery

Handling defects, new scope and deferrals

  • Block unmet criteria in the active gate rubric. Findings outside the declared rubric remain visible as audit notes or separate follow-up tickets; they cannot silently expand the accepted build.
  • A deferred ticket keeps the originating finding, evidence, owner, and acceptance conditions.
  • Keep new features separate. Changes to accepted scope require an explicit decision.
  • Decision Support advises on routing; Process Recovery diagnoses execution failures. Neither waives proof.
  • Bound retries and detect stalls. Try again only with changed facts or a changed approach.
  • Retain logs and artifacts across the pipeline so an overseer can inspect why a task advanced, stalled, changed scope or returned for repair.
Route by the layer that owns the correction
Missing or ambiguous behaviorSPEC
Missing test or faulty assertionRED
Implementation defectGREEN
Environment or transport failureRecovery
Useful additional featureSeparate ticket
Accepted product refinementDelta spec

Preserve the connected record: requirements, decisions, tickets, tests, reviews, commits, runtime proof, acceptance, and release.

Build what matters next

Bring the product.
Make the delivery dependable.

Sarolta helps teams turn product intent into defined, tested, independently reviewed software.

Single cobalt angular wing-shaped tool aligning an ivory architectural module over a small folded teal plan.

Further reading

Based on the Darkfactory PRD Analyst and Writer, generation-strategy inventory, specification and decomposition contracts, RED/GREEN and review prompts, discovery analyzer, and issue contracts DF-240, DF-262, DF-1428, HF-1087 and TDD-1097. ARA participation follows the approach defined for this article.